Skip to content

Performance Optimization

Integrated System for Project Data Management

Client
Edison
Country
Italy
Year
2014-2015
Industry
Oil & Gas
Service
Operations & Asset Performance

Edison managed its drilling and completion project data in separate files and analysed it by hand. kwantis studied and developed a system that consolidates the data, makes the analyses easier and adds value to them.

The challenge

All drilling and completion project data were managed through independent files, and the analyses were not automated. The data had to be consolidated so that analyses would be easier and bring more value.

Our approach

To reduce the cost of the new data management system, kwantis proposed building it from the existing Excel planning and reporting templates, and adding:

  • Consolidation of the information in a centralized database
  • Risk-based planning
  • Immediate reporting and analyses (business intelligence)

QlikView reports analyse all the information stored in the database dynamically and automatically.

The outcome

The reports consolidate lessons learned and support future time and cost estimates.

Using big data for operations analysis, an organization can gain real-time visibility into operations and reduce operating costs by anticipating and avoiding potential non-productive time (NPT).

Related case studies

How can we help you?

Tell us about your project, asset or data challenge. Our consultants and engineers will get back to you.

Get in touch

Quick links

↑ ↓ to navigate ↵ to open All results

Send us a message

We will get back to you shortly.