Skip to content

Complexity Modeling

DP Vessel Drifting Risk Study

Client
Eni
Country
Italy
Year
2013
Industry
Construction & Transportation
Service
Operations & Asset Performance, Reliability and Safety

For Eni, kwantis studied the risk of a floating Dynamic Positioning (DP) rig drifting off position, covering every aspect: technical, environmental, human and organizational.

The challenge

The possible drift-off of a floating DP rig is a critical risk issue, especially during deepwater drilling operations, and Eni needed a complete risk study of it.

Our approach

After an in-depth information search, kwantis built a fault tree model for a typical semi-submersible DP3 rig. It integrates existing statistical information on:

  • DP sub-system reliability: thrusters, transmission, sensors and more;
  • Environmental conditions: wind, currents, heave and more;
  • Possible human errors: vigilance, decisions and actions.

The outcome

kwantis then integrated this reliability model into e-wise, the well blowout probability model also developed by kwantis. This combines the drift-off risk with each possible drilling and completion operation.

Related case studies

How can we help you?

Tell us about your project, asset or data challenge. Our consultants and engineers will get back to you.

Get in touch

Quick links

↑ ↓ to navigate ↵ to open All results

Send us a message

We will get back to you shortly.